Home
About BSIET
Corporate Profile
Address Of Chairman
Management Team
Qualifications
Authentications
Honors
History
Associations
Market Scope
Subsidiaries
News
BSIET News
Project News
Steel
Overall Design
Stockyard
Coking
Sintering
Pelletizing
Ironmaking
Steelmaking
Steel Rolling
Industrial Furnace
Auxiliary
General Layout
Architecture and Structure
Power Supply
Electrical drive
Automation
Telecommunications
Railway Signal
Water Treatment
Fuel Gas
Oxygen
Thermal Power
Heating and Ventilation
Environmental
Water Treatment
Smoke and Gas Treatment
Thermoelectricity
Solid Waste Treatment
Civil & Municipal
Civil Architecture
Municipal Engineering
Strength
Awards
Patents
Advanced Means
Standards & Norms
Laboratory
"Engineering and Technology"
Culture
Mind Identity
Visual Identity
Social Responsibility
Activities
Contact Us
Contact Us
Sent Message
简体中文
English
BSIET News
Project News
Project News
Your location:
Home
>
News
>Project News
2012-4-23
TISCO Pelletizing Project of BSIET Received No. 1 in Comprehensive Competition
2012-3-30
The Self-developed 60t Heavy Duty Steel Coil Transportation Vehicle with Non-contact Power Supply was Put into Use
2012-3-26
Safety Management of Chuanwei Pellitizing and Sintering Project by BISET was Commended by the Owner
2012-3-26
TISCO Pelletizing Project by BSIET Received Compliment from the Owner
2012-3-26
BSIET Received Praises for Kungang Removal Project
2012-3-14
100% Qualified Products were Produced by 300,000t Cross Cut Units of Shougang Jingtang
2012-3-14
Re-cooperation between BSIET and Qiangang on BF Gas Dry Dedusting Project
2012-3-13
Wenshui Haigang New Zone Project Convened the 100-day Onrush for Start-up Mobilization Meeting
2012-1-5
The Matching 15MW Back Pressure Unit Refined Desalinization Station of Qiangang Put into Production Smoothly
2012-1-5
The RH Furnace Steam Transformation Project of Shougang Qiangang Put into Production Smoothly
2012-1-5
BSIET Held the Preliminary Design Review Meeting of the Baogang 2250mm Hot Rolling Line
2011-12-21
The Project Completion Inspection of Bar & Wire Mill and Gas Booster Station of Shuigang was Successfully Accomplished
2011-12-21
The Mating Back Pressure Unit Self-supply Power Station of Shougang Qiangang Starts up Smoothly
2011-12-8
The BSIET-Desheng Sintering General Contract Project is Highly Praised by the Owner
2011-11-4
BSIET organized design return visit to Dazhong Mining Pelletizing project
2011-10-18
A successful simulation test on energy-saving valve stand independently developed by BSIET
2011-10-18
High-temperature annular annealing furnace generally contracted by BSIET ignites and heats up
2011-10-18
BF hot stove generally contracted by BSIET is smoothly capped
2011-10-18
Generator set for sea water desalination generally contracted by BSIET combines to the grid
2011-9-21
The start-up ceremony of Shuigang high quality wire and bar EPC project was held
RecordCount: 64 PageCount: 4 FirstPage PrePage
Nextpage
EndPage